ET Docket 21-232 — Second FNPRM#
Download: Comment Summary – Second FNPRM – ET Docket 21-232 (.docx)
OET Experimental Licensing Workflow Diagram#
Full-process swim-lane diagram covering the FCC OET experimental license workflow — intake through decision, with NTIA/IRAC coordination, FCC bureau routing, special zone checks, and Part 5 license type routing. Formatted for wall/large-format printing.
Download: OET ELS Workflow Diagram (.png, ~1.9 MB)
Data References#
Collection of reference documents covering FCC data sources, ECFR regulatory text, FCC decision-making background, the ELS Zendesk integration blueprint, and a detailed overview of how the NTIA Redbook is structured, published, and transformed into a machine-usable corpus.
Download: data-references.zip (.zip, 42 KB)
ELS Analysis Package#
Business process layer, tech layer findings, and presentation materials for the FCC Experimental Licensing System (ELS).
Download: ELSinfo.zip (.zip, 71 KB)
ELS Get Well Plan#
Slide deck covering the OET experimental licensing backlog, three-lever recovery approach (staff, productivity, intake), pain-point register, and a data-driven analysis of what predicts disposal time across 47,674 granted applications.
Download: ELS Get Well Plan (.pptx)
Special Events Spectrum Licensing Research#
Research document on spectrum licensing for special events.
Download: Special Events Spectrum Licensing Research (.docx)
Staff Capacity Solver#
Interactive in-browser tool for modeling OET processing capacity against incoming application volume. Adjust headcount, processing rates, and queue assumptions to project backlog trajectories.
Open: Staff Capacity Solver (interactive, opens in browser)
DASH Reference Files#
Download: dash.zip (.zip, ~1.1 MB)

